PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed temporary tarps at the 1st floor Facing South.jpg Installing sanitary-waster piping at bathrooms 242-243 Facing South.jpg Metal Furring at the 2nd floor Shear wall Elev. 1,2,3 Facing East.jpg Preping for the Attoneys  Facing North.jpg Started installing the Curtain wall mullions at the South Elevation.jpg UCIA Roof drains-storm piping Facing South.jpg Aligning stone panels at the South Elevation.jpg Burned metal decking at the high roof for the metal stairs Facing North.jpg Electrical rouging at the 2nd floor Facing East.jpg
Previous pageNext page Started installing the Curtain wall mullions at the South Elevation
Started installing the Curtain wall mullions at the South Elevation